Residential STP services

Pay for the water we treat, not for a plant.

We take over your society's sewage treatment plant, fix what needs fixing, and run it. Your society pays a rate per cubic metre of treated water, measured at the outlet. There is no equipment bill.

What a retrofit looks like

We keep what works and add what is missing.

Grey is the plant as it stands: tanks, pumps and filters we keep where they are sound. Blue is what we bring and pay for — the electrocoagulation reactors, the outlet meter, and the monitoring behind it.

INLET + SCREEN EQUALISATION EC REACTORS we add and fund these CLARIFIER FILTERS TREATED WATER OUTLET METER you pay on this LIVE MONITORING CUBIC METRES TREATED, BY THE DAY
Your plant, retained New equipment, at our cost Measured and monitored
What we offer

Four steps, and we don't skip ahead.

Each step produces something you can read before the next one starts.

01

Assess

A surveyor visits with a phone and a tape measure. They record tank sizes, pumps, blowers, the panel, free space and how the plant is run today. We use the water test figures you already have; there is no sampling.

02

Plan and offer

We decide, unit by unit, what stays, what is repaired and what is replaced. Then we give you one price per cubic metre. We don't quote before we have seen the plant.

03

Retrofit

Where it fits, we add electrocoagulation reactors and reuse the pumps, filters and tanks that still work. We pay for the new equipment.

04

Operate

Our operators run the plant, with online monitoring. You get a monthly statement of the volume treated and the amount due.

How you pay

One rate, one meter.

The terms are written into the offer after the survey. These are the points every offer covers.

01
A rate per cubic metreTreated water, read from a calibrated outlet meter, with a check meter on your side.
02
A minimum monthly volumeSo the arrangement stays fair to both sides when your flow is low.
03
A stated quality standardAnd payment only for water that meets it.
04
PowerWho supplies it and how it is accounted for, agreed up front.
05
The term, and the equipment at the end of itWritten down before you sign, not left to be worked out later.
Where it fits

We check before we promise.

Who it is for

Residential societies with an STP

The plant is switched off, struggling, or costing more than it should, and nobody on the committee wants to run it. If your STP already works well and is cheap to run, you may not need us, and we will say so.

Where it may not

Some plants we will turn down

Some need an extra treatment stage, for nitrogen say, or have too little inflow, or no room for the new equipment. The survey tells us. If the numbers don't work, we say so instead of making an offer.

Worth saying up front

What we won't promise.

A price before we've seen the plant.No rate is quoted until a surveyor has walked the plant and we have read the figures.
A plant we can't staff.If we can't cover your site properly, we tell you early rather than stretching thin.
A number without the working.Your offer shows the volume it assumes and how the rate is built up.
A removal percentage before testing.What the plant will achieve is set against your own figures, not a brochure.
Survey corner

The plant survey.

Contact

Tell us about your plant.

Send us the society name, the number of flats and whatever you know about the plant. We will tell you whether it is worth a survey.

Emaildesign@simin.in
Phone+91 98341 87865